Reg No. | Description | Client | Contractor | Remarks |
---|---|---|---|---|
E-016 | Development of Road, Drain and other urban infrastructure (Bhanu Chowk to Salghari Chowk and drain improvement works at Tandi chowk Subba Chowk Road) Ratnanagar Municipality, Chitwan | Saghan Sahari Tatha Bhawan Nirman Aayojana, Chitwan | Om Satya Sai Construction Pvt.Ltd. | -- |
E-045 | The Project for Improvement of Water Supply in Pokhara | NWSC, Consultant: YEC | Hazama Ando Corporation | -- |
E-052 | Construction of Kishan chowk-Tandi-Aaitabare Road | Infrastructure Development Office, Pradesh No.1, Biratnagar, Morang | Sharma/Bhimeshwor JV | -- |
E-103 | Construction of Puspalal Chowk to Gachhiya Road Section | Rural Coneectivity Improvement Project (RCIP), Project Implementation Unit (PIU-1) | Lumbini-Mrit Sanjwoni JV | -- |
E-106 | Design & Build of Bridges along Dharan-Chatara-Gaighat-Katari-Sindhuli Hetauda Road II (West) | Madan Bhandari Rajmarga Yoojana Karyalaya Hetauda | ZIEC-ANK-Lumbini JV | -- |
E-134 | Underconstruction work at Kunchhal Kulekhani Road Section | Saghan Sahari Tatha Bhawan Nirman Aayojana, Chitwan | Mrit Sanjiwoni Nirman Pvt.Ltd. | -- |
E-158 | Blacktoppping works at Gaighat bazar | Triyuga Nagarpalika, Nagar Karyapalikako Karyalaya, Gaighat Udaypur | Susham-Aadtiya-Bijaya Nirman Sewa | -- |
E-164 | Construction of Biratchowk-Ghinaghat Road | Infrastructure Development Office, Pradesh No.1, Biratnagar | Shrestha-Raman-Apex JV | -- |
E-166 | Integrated Infrastructure Development Work of Birendranagar Municipality, Surkhet | Sanghiya Aayojana Karyonayan Ikai, Surkhet | Shyam and Shankar/Nanjala and Aakansha JV | -- |
E-185 | Trade Route improvement Project, Birgunj-Pathlaiya Road, Pathlaiya, bara | Byaparik Marga Bistar Yojana, Birgunj-Pathlaiya Sadak | Sapana Nirman Sewa Pvt.Ltd. | -- |
E-194 | Construction of Blacktop works along Gaushala Dekhi Aurahi Bijalpura Bhangaha Sadak Mahottari | Road Division Janakpur | Tirupati Balaji Nirman Sewa Pvt.Ltd. | -- |
E-208 | Distribution Network Improvement at Lainchaur, Baluwatar, Bishalnagar, Dhobi Khola Area | Project Implementation Directorate-KUKL, Anamnagar, kathmandu, Consultant: Eptisa Serviciou de Ingenieria, S.L. JV with ERMC (P.)Ltd | TEAMS-KUMAR-C.A.B. JV | -- |
E-253 | Distribution Network Improvement at Lainchaur, Baluwatar, Bishalnagar, Dhobi Khola Area | Project Implementation Directorate-KUKL, Anamnagar, kathmandu, Consultant: Eptisa Serviciou de Ingenieria, S.L. JV with ERMC (P.)Ltd | TEAMS-KUMAR-C.A.B. JV | -- |
E-284 | Construction of Road from Chapagaun to Ekantakuna | Kathmandu Chakrapath Sudhar Yojana | Diwa-Muskan Builders | -- |
E-317 | Strengthening (Asphalt Overlay) of Runway, Taxiway, Apron and Other Associated Works at Surkhet Airport | CAAN, Surkhet Airport Project | Raymajhi/Galwa/Jagadamba JV | -- |
E-321 | Construction of Inner Periphery Road of Pokhara Regional International Airport | Civil Aviation Authority of Nepal (CAAN) | China CAMC Engineering Co.Ltd. | -- |
E-323 | Construction of Narayanghat-Butwal Road, Section-1 | SASEC Roads Improvement Project (SRIP) ADB Loan No.3478-NEP | China State Construction Engineering Corporation Limited | -- |
E-335 | Construction of Six Lane Shyam Chowk Bypass Road | Utar Dakshin/ Byaparik Marga Bistar Aayojana Nirdeshanalaya, Janakpur Parikrama, Byaparik Marga Bistar Yoojana (Jatahi-Janakpur), Bardibas, Mohattari | Nagarjun-Hem Construction JV | -- |
E-351 | Upgrading of Mechi-Ratuwa Road (Rajgadh-Kankaimai Section, Jhapa (Ch.19+000 to 33+900) | Hulaki Rajmarga Nirdeshnalaye Yojaana Karyalaya, Itahari, Sunsari | P.S/Gajurmiukhi/Motidan JV | -- |
E-458 | Construction of Biratchowk Ghinaghat Road | Infrastructure Development Office, Morang, Pardesh No.1, Nepal | -- | |
E-476 | Road Improvement and Development Project Directorate (RIDPD) (Phase-III, Package 4) | Diwa Nirman Sewa Pvt.Ltd. | -- | |
E-626 | Underconstruction works at Pokhari Park Haat Baajar of Bharatpur Metropolitan city | Department of Urban Development and Building Construction, Chitwan | Rabina Construction Pvt.Ltd. | -- |
E-661 | Upgrading of SagarmathaHaldibari-Goldhap-Rajgadh Road at Jhapa District | Rural Connectivity Improvement Project (RCIP), Project Implementation Unit (PIU-1) | Divyajyoti-I.D. JV | -- |
E-686 | Construction of Inner Periphery Road of Pokhara Regional International Airport | Civil Aviation Authority of Nepal (CAAN) | China CAMC Engineering Co.Ltd. | -- |
E-714 | Rani Biratnagar Itahari Dharan Road (Ch:0+000 to 0+180) | Kanchharam Construction Company Pvt.Ltd | -- | |
E-149 | Upgrading and Performance Based Maintenance of (1) Mudikuwa-Lunkhu Road (Road_1) and (2) Armadi-Banau Road (Road_2) in Parbat District | Tundi Construction Pvt.Ltd. | -- | |
E-153 | Distribution Network Improvement at Lainchaur, Baluwatar, Bishalnagar, Dhobi Khola Area | Project Implementation Directorate-KUKL, Anamnagar, kathmandu, Consultant: Eptisa Serviciou de Ingenieria, S.L. JV with ERMC (P.)Ltd | TEAMS-KUMAR-C.A.B. JV | -- |
E-169 | Construction of Roads and Drains at Birtamode Municipality, Jhapa | Saghan Sahari Tatha Bhawan Nirman Aayojana, Jhapa | Motidan/ Raymajhi JV | -- |
E-182 | Construction of Roads and Drains at Birtamode Municipality, Jhapa | Saghan Sahari Tatha Bhawan Nirman Aayojana, Jhapa | Motidan/ Raymajhi JV | -- |
E-293 | Construction of Mahendra Raajmarga Lother CH 436+000-465+000 Road Chitwan | Road Division, Bharatpur | Arbindra Construction | -- |
Construction of Tandi Sauraha Road, Chitwan | Road Division, Bharatpur | Arbindra Construction | -- | |
Construction of Mugling-Narayanghat Road, Chitwan | Road Division, Bharatpur | Arbindra Construction | -- | |
Construction of Bharatpur-Mehauli Road, Chitwan | Road Division, Bharatpur | Arbindra Construction | -- | |
E-323 | Construction of Narayanghat-Butwal Road, Section-1 | SASEC Roads Improvement Project (SRIP) ADB Loan No.3478-NEP | China State Construction Engineering Corporation Limited | -- |
E-356 | Blacktop works at road of wards- 6&7, Panitanki-Dadatole-Majhitar Sindhuli Part 1 | Kamalamai Municipality | Pachani Construction Pvt.Ltd. | -- |
Blacktop works at road of wards- 6&7, Panitanki-Dadatole-Majhitar Sindhuli Part 2 | Kamalamai Municipality | Pachani Construction Pvt.Ltd. | -- | |
E-374 | Road Aanya Bistarit Sadak(Road Widening and upgrading works on Anya Bistarit Sadak(Siwa Marga-Badri Store-Manohara hotel Road,Lokanthali- Bhaktapur, Chardobato Balkot Redcross Marga-Surabinayak-2,Sristimarga-Srijanagar, Bhaktapur, MuskanSewa Nepal-Suryabinayak 8 Sipadol) | Road Division, Bhaktapur | Dhital Nirman Sewa Pvt.Ltd. | -- |
E-503 | Construction of Approach Road of Katuwa Khola Bridge | Road Division Office, Ghorahi, Dang | Shankarmali Nirman Sewa (P.) ltd. | -- |
E-505 | Periodic Repair of Road Surface in Gokuleshwor-Khalanga Section (Ch.89+000 Km-109+000 Km) and Satbanjh-Gokuleshwor Section (Ch.28+000-33+000 Km) of Satbajh Thaktoli Darchula Tinker Road(NH66) | Road Division, Baitadi | Bajraguru-B&B JV | -- |
E-533 | Upgrading/Improvement of Charikot-Jiri Road (Ch 55+000-110+440 Sector of Lamosangu-Tamakoshi-Jiri Road) | Road Improvement and Development Project | Woodhill-Lama JV | -- |
E-563 | Construction of Satasidham-Jhiljhile-Hawaldar Chowk-Chauri Road | Purbadhar Bikas Karyalaya, Pradesh No.1, Jhapa, Nepal | Rautaha-Khanal JV | -- |
E-575 | Upgrading of SagarmathaHaldibari-Goldhap-Rajgadh Road at Jhapa District | Rural Connectivity Improvement Project (RCIP), Project Implementation Unit (PIU-1) | Divyajyoti-I.D. JV | -- |
E-602 | Blacktopped Road Construction at different ward of Bharatpur Metropolitan City-Package 2 | Bharatpur Municipality | Himsagarmatha-Kripa-Royal JV | -- |
E-647 | Recurrent Maintenance of Tripureshwor to Maharajgunj and other road under sector B | Golden Construction | -- | |
E-966 | Upgrading /Improvement of Bardibas-Jaleshwor (Ch 0+000-42+450), Jaleshwor Urban Road (16.55.00km), Rajbiraj (15.60km) and Siraha (15.00km) Urban Road | Road Improvement and Development Project Directorate (RIDPD) | Shivalaya-Diwa JV | -- |
E-979 | Construction of Birat Chowk Dhinaghat Road (Chainage: 20+000 to 22+195) and Singhaiya River Bridge | Purbadhar Bikas Karyalaya, Pradesh No.1, Biratnagar, Morang | Lama-Baniya JV | -- |
E-1162 | Backcutting with Rehabilitation Works-Dailekh Road (Ch:28+000 to 67+000 to 68+100) | Road Division Surkhet | Shyam & Shankar Construction Pvt.Ltd. | -- |
Reg No | Project | Client | Contractor | Work |
---|---|---|---|---|
E-027 | Nagdhunga Tunnel Construction Project | Hazama Ando Corporation | Cement Test only | |
E-035 | Main Retrofitting Works in Bhaktapur Hospital | DUDBC | Rabina -Kirateshwor-Shrinkhala JV | Cement Test only |
E-036 | Kathmandu Terai/Madhesh Fast Track (Expressway) Road Project | Nepal Army | Raman-Tribeni JV | Cement Test only |
E-046 | Main Retrofitting Works in Bhaktapur Hospital | Department of Urban Planning and Building Construction | Rabina-Kirateshwor-Shrinkhala JV | Cement Test only |
E-047 | Design & Build of Six Bridges along Madan Bhandari Highway (Sindhuli-Hetauda Section), Sindhuli/ Makwanpur) | Kalika-Vedanshee JV | For Mix Design | |
E-054 | Nagdhunga Tunnel Construction Project | Hazama Ando Corporation | Cement Test only | |
E-063 | Upgrading of Dumre Besisahar Road (Chainage 0+220 to 8+300), Tanahun | Dumre Besisahar Chame Road Project, Besisahar, Lamjung | Ashish/Honest JV |
For Mix Design Cement Test only |
E-093 | Kathmandu-Terai/Madesh Fast Track (Express-way) Road Project | Nepal Army | Raman-Tribeni JV | Cement Test only |
E-105 | Construction of Bailey Bridge Abutment and Road Works | Nepal Army | Ashish-Om Sai Ram JV | Cement Test only |
E-264 | Design & Build of two Bridges along Madan Bhandari Highway, Morang | Madan Bhandari Highway Project Office Damak, Jhapa | Lumbini-Apex-Bandan Bhagwati JV | Cement Test only |
E-265 | Design & Build of two Bridges along Madan Bhandari Highway, Morang | Madan Bhandari Highway Project Office Damak, Jhapa | Lumbini-Apex-Bandan Bhagwati JV | Cement Test only |
E-287 | Construction of Oriya Khola Bridge along Jaymangalapur-Tulshibarwa Road | Chhipaharmai Gaunpalika, Viswa, Parsa | For mix Design(M25) & Cement Test | |
E-288 | Construction of Tier Khola Bridge along Itahar-Belahi Road Bara | Infrastructure Development Office, Parsa | Nagarjun-Binod Sah JV | For mix Design(M25) & Cement Test |
E-340 | Construction of Four Health Post Buildings (Type-4-HP Frame Structure) at Haku, Ramche, Syaphru and Thulogaun in Rasuwa District for Ramche Siteg m | DLPIU Rasuwa, Dhunche Rasuwa | Om Buddha International Construction Pvt.Ltd. | |
E-341 | Construction of Four Health Post Buildings (Type-4-HP Frame Structure) at Haku, Ramche, Syaphru and Thulogaun in Rasuwa District for Thulogaun Site | DLPIU Rasuwa, Dhunche Rasuwa | Om Buddha International Construction Pvt.Ltd. | |
E-435 | Construction of Model Veterinary Hospital at Damauli, Tanahun | Veterinary Hospital and Livestock Service Expert Center, Damauli, Tanahun | Eco Builders Pvt.Ltd. | Cement Test only |
E-439 | Upgrading & Improvement of Sindhulibazaar (Sindhuli)-Hetauda(Makwanpur) Road | Madan Bhandari Highway Project Office Hetauda, Hetauda, Makwanpur | Kalika-Swachchhanda-Ranken JV | For mix Design(M25) & Cement Test |
E-443 | Construction of 15m Span 2 Webbed RC Slab Deck Bridge at Daunte Khola (Halesi-Jayaramghat Road Sector) | Puspalal (Mid Hills) Highway Project | Surya/K.M JV | Cement Test |
E-459 | Kathmandu-Terai/Madhesh Fast Track (Express-way) Road Project | Nepal Army | Apex-Gajurmukhi JV | Cement Test |
E-467 | Construction of Wastewater Treatment Plant at Dhobighat | Kathmandu Upatyaka Khanepani Limited, Project Implementation Directorate | CGCOC-ATAL | Cement Test |
E-502 | Construction of Multipurpose Auditorium Building (Package A) | Budhanilkantha School, Kathmandu | Lama Construction | MIX Desighn |
E-542 | Extension of Runway, Taxiway, Apron and other associated works at Ramechhap Airport | CAAN, Ramechhap Airport Project, Manthali, Ramechhap | Kanchharam Construction Company | Cement Test |
E-567 | Construction of Marin Khola Bridge along Hariharpurgadhi Ga.Pa. Ward No.2, Bakhafar and Ward No.4, Hakapur Road Hariharpurgadhi Rural Municipality, Sindhuli | Pradesik Sadak Division Karyalaya, Bagmati Pradesh | Himdung & Thokar-Immanuyal-Saras JV | For mix Design(M25,M35,M45) & Cement Test of Shivam Only |
E-596 | Construction of Three Type-4 Health post Buildings in Dhading Goganpani HP (Galchhi RM), Sankoshi HP (Nilkantha Municipality) and Tripureshwor HP (Tripurasundary RM) Dhading | Aayojana Karyanayan Ekai (Bhawan Tatha Aawas),Dhading | Pushpanjali/Siwako JV | Cement Test |
E-590 | Construction of Seven Health Building at Nuwakot District (Type 3 Health Post Building of Lachyang HP3 (Suryagadhi RM) ) | Aayojana Karyanayan Ekai (Bhawan Tatha Aawas), Dhading | ANK/Puspanjali/P.S JV | |
E-612 | Construction of 10 Bed Hospital Bamti-2 | Gau Karyapalikako Karyalaya, Ramechhap | Gaura Banglamukhi Umakunda JV | |
E-644 | Design & Build of Beg Khola Galeshwor, Myagdi | BKOI-Himalayan JV | ||
E-657 | Construction of Bridge at Midim Khola | Road Division, Damauli, Tanahu | Dragon Hira & Namita | |
E-660 | Construction of RCC Bridge at Khani Khola from Sanghidanda to Gumsi Road of Sunapati Gaunpalika | Infrastructure Development Office, Manthalli, Ramechhap | Kanchharam Construction Company Pvt.Ltd. | |
E-681 | Construction of Bajedichaur 15 Bedded Hospital Building, Simta Rural Municipality, Surkhet | Mountain Kabindra JV | ||
E-718 | Kathmandu-Terai/Madhesh Fast Track (Express-way) Road Project | Nepal Army | Raman-Tribeni JV | |
E-719 | Kathmandu-Terai/Madhesh Fast Track (Express-way) Road Project | Nepal Army | Raman-Tribeni JV | |
E-825 | Construction of Shopping Complex and Children Park, Ratnapark, Diktel | Diktel Rupakot Majhuwagadi Municipality, Diktel Khotang | Uma-Lama-Anshubi JV | |
E-872 | Project: Construction of Guest House Buiding at Sunkoshi Hydropower Station Lamosangu, Sindhupalchowk | NEA (Sunkoshi Hydropower Station), Lamosangu Sindhupalchowk | Santosh Nirman Sewa | |
E-885 | Construction of Mainamaini Hasanpur Chuhar Ghoretar Bhojpur Dingla Sadak, Udayapur | Pradesik Bisesh Sadak Nirman Aayojana Karyalaya, Pardesh No.1, Biratnagar | Kanchharam/Pacific JV | |
E-1085 | Upgrading Madhya Marg Road Works at Umakunda Gaupalika | Umakunda Gaupalika, Gaun Karyapalikako Karyalaya, Ramechhap | Motidan Construction Sewa | |
E-1243 | Construction of Bavari Tower | Bavari Construction Pvt.Ltd. | Vedalaya Construction Pvt.Ltd. |
Core Asphaltconcrete Core
SN No. | Project | Client | Contractor | Location | Contract Number |
---|---|---|---|---|---|
1 | Construction of MRM (Baidi Chowk) Magaradhi Padanaha Kusumbaghat Road, Bardiya | Road Infrastructure Development office, Bardiya | Amar/Sisne J/V | RIDO/BARDIYA/W/NCB/ROAD/03/76-77 | |
2 | Strengthening (Asphalt Overlay) of Runway, Taxiway, Apron and Other Associated Works at Surkhet Airport | Civil Aviation Authority of Nepal, Surkhet Airport Project, Surkhet | Rayamajhi/Galwa/Jagadamba J/V | CAAN/AED/SKH/Asphalt/076-77/17 | |
3 | Construction of Laboratory Quality Control Lab | Sthapati Directorate, Bhadrakali | Suryakunda Engineers and Builders Pvt. Ltd., Kathmandu | Swayambhu, Kathmandu | NA/DOS/076/077/03 |
4 | Development of Road, Drain and other Urban Infrastructure (Bhanu Chowk to Salghari Chowk and Drain Improvement Works at Tandi Chowk Subba Chowk Road) | Saghan Sahari Tatha Bhawan Nirman Aayojana, Chitwan | Shree Om Satya Sai Construction Pvt. Ltd., Bharatpur, Chitwan | PUDBC/CHITWAN/NCB/WORKS/11-077/078 | |
5 | Asphalt Overlay Works in Sindhuli-Khurkot Section of Dhulikhel-Sindhuli Bardibas Road at Chainage 49+935-51+760&74+600-76+000 | Suryabinayak-Dhulikhel, Dhulikhel-Sindhuli-Bardibas Road Project | Immanuyal Construction | SDSBR/337011384/078/79-05 | |
6 | Upgrading of Bijaypur-Majthana Road (Package-1) | Pokhara Metropolitan City, Office of the Municipal Executive, New Road | Khadka Krishna/P.K J.V | 6/PMC/NCB/W/R/077-078 | |
7 | Pavement Classification Number (PCN) Calculation at Tumlingtar Airport | Aerodrome Engineering Department, Civil Aviation Authority of Nepal | Tumlingtar Airport | ||
8 | Construction of Prestressed Concrete Bridge Over Lasku Gad Khola in Mahakali Highway | Darchula-Tinker Road Project Office | Rajendra/Devsingh/Malikarjun J/V | DTRP/3373204/072/73/001 (RE) | |
9 | Construction of Liding Khola Motorable Bridge | Aishelu Kharka Rural Municipality | Puspanjali/Jimba J/V | ARM-KHO-07/2077-78/NCB | |
10 | Upgrading/Improvement of Sindhuli Bazar (Sindhuli)-Hetauda (Makwanpur) Section of Dharan-Chatara-Gaighat-Katari-Sindhuli-Hetauda Road (Ch.196+720 to Ch.311+761) | Madan Bhandari Highway Project, Hetauda | M/S Kalika-Swachhanda-Ranken J/V | DCGKSHP/PCU/337125/072/073-002 |
For mix Design & Cement Test
Reg No | Project | Client | Contractor | Work |
---|---|---|---|---|
E-063 | Upgrading of Dumre Besisahar Road (Chainage 0+220 to 8+300), Tanahun | Dumre Besisahar Chame Road Project, Besisahar, Lamjung | Ashish/Honest JV | For Mix Design |
E-502 | Construction of Multipurpose Auditorium Building (Package A) | Client: Budhanilkantha School, Kathmandu | Lama Construction | MIX Desighn |
E-288 | Construction of Tier Khola Bridge along Itahar-Belahi Road Bara | Infrastructure Development Office, Parsa | Nagarjun-Binod Sah JV | For mix Design(M25) & Cement Test |
E-439 | Upgrading & Improvement of Sindhulibazaar (Sindhuli)-Hetauda(Makwanpur) Road | Madan Bhandari Highway Project Office Hetauda, Hetauda, Makwanpur | Kalika-Swachchhanda-Ranken JV | For mix Design(M25) & Cement Test |
E-567 | Construction of Marin Khola Bridge along Hariharpurgadhi Ga.Pa. Ward No.2, Bakhafar and Ward No.4, Hakapur Road Hariharpurgadhi Rural Municipality, Sindhuli | Pradesik Sadak Division Karyalaya, Bagmati Pradesh | Himdung & Thokar-Immanuyal-Saras JV | For mix Design(M25,M35,M45) & Cement Test |
For marshall Design and Bitumen Test
Reg No | Project | Client | Contractor | Work |
---|---|---|---|---|
E-045 | The Project for Improvement of Water Supply in Pokhara | Client: NWSC, Consultant: YEC | Hazama Ando Corporation | For marshall Design and Bitumen Test |
E-185 | Trade Route improvement Project, Birgunj-Pathlaiya Road, Pathlaiya, bara | Byaparik Marga Bistar Yojana, Birgunj-Pathlaiya Sadak | Sapana Nirman Sewa Pvt.Ltd. | For marshall Design and Bitumen Test |
E-686 | Construction of Inner Periphery Road of Pokhara Regional International Airport | Civil Aviation Authority of Nepal (CAAN) | China CAMC Engineering Co.Ltd. | For marshall Design and Bitumen Test |
E-505 | Periodic Repair of Road Surface in Gokuleshwor-Khalanga Section (Ch.89+000 Km-109+000 Km) and Satbanjh-Gokuleshwor Section (Ch.28+000-33+000 Km) of Satbajh Thaktoli Darchula Tinker Road(NH66) | Client: Road Division, Baitadi | Bajraguru-B&B JV | For marshall Design and Bitumen Test |
E-979 | Construction of Birat Chowk Dhinaghat Road (Chainage: 20+000 to 22+195) and Singhaiya River Bridge | Client: Purbadhar Bikas Karyalaya, Pradesh No.1, Biratnagar, Morang | Lama-Baniya JV | For marshall Design and Bitumen Test |
For Rebar Test
Reg No | Project | Client | Contractor | Work |
---|---|---|---|---|
vce1283 | China-Aid Timure border inspection station project in Nepal | Rasuwa Dry port | Tibet Fuli Construction Group Company Ltd. | For Rebar Test |
vce1169 | Mugling-Anbukhaireni-Pokhara Road Section-1(Km 08+250 to Km 49+700) | Renardet Sa Consulting Engineers Pvt.Ltd. In association with Soil Test (P.) Ltd.,Nepal and CEMAT Consultants | China Communications Construction Company Ltd. | For Rebar Test |
vce1164 | Nagdhunga Tunnel Construction Project | DOR | HAZAMA ANDO Corporation | For Rebar Test |
vce404 | Periodic maintenance (Surface design and Structural Works) Works along Khurkot-Ghurmi Road Sindhuli | Puspalal Highway Project Office Dhulikhel, Kavre | Kalika/ Bedanshi JV | For Rebar Test |
vce401 | Design & Build of Five Bridges along Madan Bhandari Highway (Basaha-Bhiman Section), Sindhuli/Udaypur | Madan Bhandari Highway Bhiman Gaighat Sector | Lumbini-Khani-Samanantar JV | For Rebar Test |
For Pile Load & Pile Integrity Test
SN No. | Project | Client | Contractor |
---|---|---|---|
1 | Construction of Bagmati river IPC railway bridge at Rautahat | Department of Railways | Rasuwa Construction Company (p) ltd |
2 | Design & build of chaju Khola bridge at Madan Bhandari highway illam District, Nepal | Madan Bhandari Highway Project Directorate | M/S Kalika-Sharma-rasuwa JV, Dhapasi, Kathmandu |
3 | Construction of RCC bridge over gagan Khola | Hulaki Rajmarga, Siraha | Hirachan Roshan JV |
4 | Construction of RCC bridge over khorke Khola bridge at Surkhet | Division Road Office Surkhet | Sapana / Ashish / Shyam & Shankar |
5 | Design & build of babai river bridge, Dumduwali | Bridge Branch | MS Rasuwa - Elite JV |